{"id":2209,"date":"2020-11-26T10:30:34","date_gmt":"2020-11-26T09:30:34","guid":{"rendered":"https:\/\/legacy.museum-reinhard-ernst.de\/news\/bauarbeiten-stand-26-november-2020\/"},"modified":"2021-03-18T10:32:14","modified_gmt":"2021-03-18T09:32:14","slug":"bauarbeiten-stand-26-november-2020","status":"publish","type":"post","link":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/","title":{"rendered":"Construction work, as at 26 November 2020"},"content":{"rendered":"<div class=\"ce ce-onecol \">\r\n\t<div class=\"container\">\r\n\t\t<div class=\"row\">\r\n\t\t\t<div class=\"col-sm\">\r\n\t\t\t\t<p class=\"p1\">Construction of the\u00a0Reinhard Ernst Museum is still going according to plan. Almost all the walls on\u00a0the first floor are already standing, while around\u00a0half of the floor is already\u00a0covered. Its ceilings will be completed by the Christmas holidays. In the\u00a0period from 18 December to 11 January, it will\u00a0then be quiet on Wilhelmstrasse\u00a01, as the construction workers and civil engineers have a well-earned peaceful\u00a0and relaxing holiday.<\/p>\n<p class=\"p1\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2032\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-3-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-3-1024x683.jpg 1024w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-3-300x200.jpg 300w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-3-768x512.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-3.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/>On the ground floor of\u00a0the museum, visitors can enter a room dedicated to temporary exhibitions. Its\u00a0sheer height of up to 9.45 metres extends over\u00a0two floors, which means very\u00a0large exhibits can be presented there. This particular height also involves special\u00a0requirements in construction. As the\u00a0image above shows, the space is filled with\u00a0a large amount of scaffolding material; this construction that has since been\u00a0extended to the height of the\u00a0room is required in order to be able to form the\u00a0ceiling.<\/p>\n<p>The exterior view from\u00a0the Rheinstrasse shows a scaffolding system that also protects construction\u00a0workers from falling. The reinforcements and\u00a0cladding of the walls are carried\u00a0out from these work levels for the second floor.<\/p>\n<p class=\"p1\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2030\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-14-1024x715.jpg\" alt=\"\" width=\"1024\" height=\"715\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-14-1024x715.jpg 1024w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-14-300x209.jpg 300w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-14-768x536.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-14.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/>More black plastic\u00a0balls, known as bubbles, will be used during the next few weeks. We had already\u00a0explained the principle in previous construction\u00a0status reports. Using hollow\u00a0objects makes the ceilings lighter so they can be stretched further or supports\u00a0can be dispensed with. The view from the\u00a0crane shows the black bubbles that\u00a0have already been placed in the rear corner. At the bottom right, you can see\u00a0the previously described (red)\u00a0intermediate level and the second scaffolding\u00a0level that continues in the room for the temporary exhibitions.<\/p>\n<p class=\"p1\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2028\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Kranansicht-1024x768.jpg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Kranansicht-1024x768.jpg 1024w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Kranansicht-300x225.jpg 300w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Kranansicht-768x576.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Kranansicht.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2048\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles2-1024x636.jpg\" alt=\"\" width=\"1024\" height=\"636\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles2-1024x636.jpg 1024w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles2-300x186.jpg 300w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles2-768x477.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles2.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2050\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles4-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles4-1024x683.jpg 1024w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles4-300x200.jpg 300w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles4-768x512.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles4.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2046\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles3-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles3-1024x683.jpg 1024w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles3-300x200.jpg 300w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles3-768x512.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles3.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2052\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles1-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles1-1024x683.jpg 1024w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles1-300x200.jpg 300w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles1-768x512.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November2020-Bubbles1.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/>A forest of yellow\u00a0heavy-duty supports that can be extended further using a telescopic mechanism, supports\u00a0the ceiling of the large engineering room\u00a0in the basement. At this location, measuring\u00a0more than 450 square metres, numerous devices are housed for the museum\u2019s\u00a0heating, ventilation and air\u00a0conditioning systems.<\/p>\n<figure><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2026\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-22-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-22-1024x683.jpg 1024w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-22-300x200.jpg 300w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-22-768x512.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-22.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<p class=\"p1\">The fa\u00e7ade work has\u00a0already been commissioned, which will start after completion of the shell in\u00a0early 2021. This includes the large glazing work on\u00a0the ground floor, the\u00a0vertical slats made of sheet steel and the outer fa\u00e7ade made of light granite.\u00a0(This stone was also used at the famous\u00a0Aga Khan Museum\u00a0in Toronto.) You can clearly see\u00a0the\u00a0outer skin of the museum on the computer visualisation of the architect\u2019s\u00a0office below. Incidentally,\u00a0Tony Cragg\u2019s work of art\u00a0has been elevated 6.5 metres above\u00a0the\u00a0terrace area (above the main entrance) to the first floor, inserted through\u00a0the still unglazed opening into the building itself and set up in its place. The\u00a0two-part sculpture\u00a0then rises up into the second floor.<\/p>\n<figure><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2034\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/190913-ExteriorFrontalView-1024x615.jpg\" alt=\"\" width=\"1024\" height=\"615\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/190913-ExteriorFrontalView-1024x615.jpg 1024w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/190913-ExteriorFrontalView-300x180.jpg 300w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/190913-ExteriorFrontalView-768x462.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/190913-ExteriorFrontalView.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-2040\" src=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/08\/Gipsmodell_Tony-Cragg-988x1024.jpg\" alt=\"\" width=\"988\" height=\"1024\" srcset=\"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/08\/Gipsmodell_Tony-Cragg-988x1024.jpg 988w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/08\/Gipsmodell_Tony-Cragg-290x300.jpg 290w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/08\/Gipsmodell_Tony-Cragg-768x796.jpg 768w, https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/08\/Gipsmodell_Tony-Cragg.jpg 1080w\" sizes=\"auto, (max-width: 988px) 100vw, 988px\" \/><\/figure>\n<h5>The moulds of the two-part sculpture in their original size<\/h5>\n\t\t\t<\/div>\r\n\t\t<\/div>\r\n\t<\/div>\r\n<\/div>\r\n","protected":false},"excerpt":{"rendered":"<p>Construction of the\u00a0Reinhard Ernst Museum is still going according to plan. Almost all the walls on\u00a0the first floor are already standing, while around\u00a0half of the floor is already\u00a0covered. Its ceilings will be completed by the Christmas holidays. In the\u00a0period from 18 December to 11 January, it will\u00a0then be quiet on Wilhelmstrasse\u00a01, as the construction workers [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2031,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[7],"tags":[],"class_list":["post-2209","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction work, as at 26 November 2020 - museum reinhard ernst<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Thilo von Debschitz\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/\"},\"author\":{\"name\":\"Thilo von Debschitz\",\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/de\\\/#\\\/schema\\\/person\\\/ddbea0d772e761059e4959f5281bd106\"},\"headline\":\"Construction work, as at 26 November 2020\",\"datePublished\":\"2020-11-26T09:30:34+00:00\",\"dateModified\":\"2021-03-18T09:32:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/\"},\"wordCount\":5,\"image\":{\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/legacy.museum-reinhard-ernst.de\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/November-2020-Bild-14.jpg\",\"articleSection\":[\"Construction\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/\",\"url\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/\",\"name\":\"Construction work, as at 26 November 2020 - museum reinhard ernst\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/legacy.museum-reinhard-ernst.de\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/November-2020-Bild-14.jpg\",\"datePublished\":\"2020-11-26T09:30:34+00:00\",\"dateModified\":\"2021-03-18T09:32:14+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/de\\\/#\\\/schema\\\/person\\\/ddbea0d772e761059e4959f5281bd106\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/#primaryimage\",\"url\":\"https:\\\/\\\/legacy.museum-reinhard-ernst.de\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/November-2020-Bild-14.jpg\",\"contentUrl\":\"https:\\\/\\\/legacy.museum-reinhard-ernst.de\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/November-2020-Bild-14.jpg\",\"width\":1080,\"height\":754},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/news\\\/bauarbeiten-stand-26-november-2020\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction work, as at 26 November 2020\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/de\\\/\",\"name\":\"museum reinhard ernst\",\"description\":\"Eine weitere WordPress-Website\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.museum-reinhard-ernst.de\\\/de\\\/#\\\/schema\\\/person\\\/ddbea0d772e761059e4959f5281bd106\",\"name\":\"Thilo von Debschitz\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/13d5cea3e489ffc83a45421c0c9290d77c35b2164a96d941d0e637468340f02f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/13d5cea3e489ffc83a45421c0c9290d77c35b2164a96d941d0e637468340f02f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/13d5cea3e489ffc83a45421c0c9290d77c35b2164a96d941d0e637468340f02f?s=96&d=mm&r=g\",\"caption\":\"Thilo von Debschitz\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction work, as at 26 November 2020 - museum reinhard ernst","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/","twitter_misc":{"Written by":"Thilo von Debschitz"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/#article","isPartOf":{"@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/"},"author":{"name":"Thilo von Debschitz","@id":"https:\/\/www.museum-reinhard-ernst.de\/de\/#\/schema\/person\/ddbea0d772e761059e4959f5281bd106"},"headline":"Construction work, as at 26 November 2020","datePublished":"2020-11-26T09:30:34+00:00","dateModified":"2021-03-18T09:32:14+00:00","mainEntityOfPage":{"@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/"},"wordCount":5,"image":{"@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/#primaryimage"},"thumbnailUrl":"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-14.jpg","articleSection":["Construction"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/","url":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/","name":"Construction work, as at 26 November 2020 - museum reinhard ernst","isPartOf":{"@id":"https:\/\/www.museum-reinhard-ernst.de\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/#primaryimage"},"image":{"@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/#primaryimage"},"thumbnailUrl":"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-14.jpg","datePublished":"2020-11-26T09:30:34+00:00","dateModified":"2021-03-18T09:32:14+00:00","author":{"@id":"https:\/\/www.museum-reinhard-ernst.de\/de\/#\/schema\/person\/ddbea0d772e761059e4959f5281bd106"},"breadcrumb":{"@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/#primaryimage","url":"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-14.jpg","contentUrl":"https:\/\/legacy.museum-reinhard-ernst.de\/wp-content\/uploads\/2020\/11\/November-2020-Bild-14.jpg","width":1080,"height":754},{"@type":"BreadcrumbList","@id":"https:\/\/www.museum-reinhard-ernst.de\/en\/news\/bauarbeiten-stand-26-november-2020\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.museum-reinhard-ernst.de\/en\/"},{"@type":"ListItem","position":2,"name":"Construction work, as at 26 November 2020"}]},{"@type":"WebSite","@id":"https:\/\/www.museum-reinhard-ernst.de\/de\/#website","url":"https:\/\/www.museum-reinhard-ernst.de\/de\/","name":"museum reinhard ernst","description":"Eine weitere WordPress-Website","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.museum-reinhard-ernst.de\/de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.museum-reinhard-ernst.de\/de\/#\/schema\/person\/ddbea0d772e761059e4959f5281bd106","name":"Thilo von Debschitz","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/13d5cea3e489ffc83a45421c0c9290d77c35b2164a96d941d0e637468340f02f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/13d5cea3e489ffc83a45421c0c9290d77c35b2164a96d941d0e637468340f02f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/13d5cea3e489ffc83a45421c0c9290d77c35b2164a96d941d0e637468340f02f?s=96&d=mm&r=g","caption":"Thilo von Debschitz"}}]}},"_links":{"self":[{"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/posts\/2209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/comments?post=2209"}],"version-history":[{"count":3,"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/posts\/2209\/revisions"}],"predecessor-version":[{"id":2212,"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/posts\/2209\/revisions\/2212"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/media\/2031"}],"wp:attachment":[{"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/media?parent=2209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/categories?post=2209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/legacy.museum-reinhard-ernst.de\/en\/wp-json\/wp\/v2\/tags?post=2209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}